{"id":1679,"date":"2024-05-25T12:09:19","date_gmt":"2024-05-25T09:09:19","guid":{"rendered":"https:\/\/golden-jewel.com\/?page_id=1679"},"modified":"2026-05-01T11:44:36","modified_gmt":"2026-05-01T08:44:36","slug":"projects","status":"publish","type":"page","link":"https:\/\/golden-jewel.com\/?page_id=1679","title":{"rendered":"Projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"1679\" class=\"elementor elementor-1679\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-28470c73 e-flex e-con-boxed e-con e-parent\" data-id=\"28470c73\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-11bad0d6 elementor-widget elementor-widget-spacer\" data-id=\"11bad0d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b17aa02 elementor-widget elementor-widget-spacer\" data-id=\"3b17aa02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4f03c50 e-flex e-con-boxed e-con e-parent\" data-id=\"4f03c50\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-028d316 elementor-widget elementor-widget-text-editor\" data-id=\"028d316\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>THE PROJECTS LISTED ON THE ITEMS BELOW COMPRISE A SELECTION OF SUCCESSFULLY EXECUTED.<\/p><p><strong>(WATER &amp; WASTEWATER PROJECT)<\/strong><br \/>\u2022JUBAL ALI WATER REVERSE OSMOSIS PLANT<br \/>HAS A CAPACITY OF 120,000 M3\/ DAY.<br \/>\u2022AJMAN WATER REVERSE OSMOSIS PLANT<br \/>HAS A CAPACITY OF 160,000 M3\/DAY.<br \/>\u2022AL GULF VILLAGE WATER REVERSE OSMOSIS PLANT HAS A CAPACITY OF 60,000M3\/DAY.<br \/>\u2022KAIZAD WATER REVERSE OSMOSIS PLANT<br \/>HAS A CAPACITY OF 90,000 M3\/ DAY.<br \/>\u2022AL SHWAAF WATER REVERSE OSMOSIS PLANT HAS A CAPACITY OF 30,000 M3\/ DAY.<br \/>\u2022AL QUO&#8217;A WATER REVERSE OSMOSIS PLANT HAS A CAPACITY OF 50,000 M3\/ DAY. INDUSTRIAL CITY \u2022WASTEWATER TREATMENT PLANT HAS A CAPACITY OF 350,000 M3\/ DAY.<br \/>\u2022AL FUJERAH WASTEWATER TREATMENT PLANT<br \/>HAS A CAPACITY OF 350,000 M3\/DAY.<br \/>\u2022AL KHANOOF WASTEWATER TREATMENT PLANT<br \/>HAS A CAPACITY OF 350,000 M3\/DAY.<br \/>\u2022AL WATEEF WASTEWATER TREATMENT PLANT HAS A CAPACITY OF 350,000 M3\/DAY.<br \/>\u2022UM ALJAMAMIL WATER TREATMENT PLANT (DOMESTIC WATER) HAS A CAPACITY OF 6,000 M3\/HR. \u2022ALAIN WATER TREATMENT PLANT (DOMESTIC WATER) HAS A CAPACITY OF 4,000 M3\/HR.<br \/>\u2022KOUR FAKAN WATER TREATMENT PLANT<br \/>(DOMESTIC WATER) HAS A CAPACITY OF 5,000 M3\/HR. \u2022LAMAR WATER TREATMENT PLANT<br \/>HAS A CAPACITY OF 8,000 M3\/HR.<br \/>\u2022ATBARA WATER TREATMENT PLANT<br \/>(DOMESTIC WATER) HAS A CAPACITY OF 4,000 M3\/HR.<\/p><p><strong>(POWER TRANSMISSION &amp; DISTRIBUTION PROJECT)<\/strong><br \/>\u202260 KV, 80 KM-LINE ABU DHABI &#8211; AL AIN AND 110 KV,95 KM<br \/>LINE FROM AL AIN TO ADNCK AND SUBSTATIONS IN AL AIN.<\/p><p>\u2022 33\/11 KV PRIMARY SUBSTATIONS AND 22(11)\/0.4 KV DISTRIBUTION SUBSTATIONS IN ABU DHABI TO FEED THE UM ALKHEEL INDUSTRIAL ZONE AND DISTRIBUTION NETWORK.<br \/>\u2022132\/33 KV SUBSTATION ATAL FUJERAH TO FEED THE AL YAS ISLAND AND THE DISTRIBUTION NETWORK OF THE ANSOUMANIA ZONE.<\/p><p>\u2022400 KV, 54 KM &#8211; DOUBLE CIRCUIT OHL IN AJMAN TO SHARJAH<br \/>INCLUDING SUBSTATION IN AJMAN.<br \/>\u2022AL FUGERAH 132 KV 190 KM, DOUBLE-CIRCUIT TRANSMISSION LINES AND LINE IN-\/LINE OUTS TO SUBSTATIONS IN AL FUJERA.<\/p><p>\u202233\/11 KV PRIMARY SUBSTATION IN DUBAI TO PROVIDE<br \/>HIGH VOLTAGE POWER TO THE AL RIADEH DEVELOPMENT SITE INCLUDING THE CABLE LAYING WORKS FROM THE GRID STATION TO PRIMARY SUBSTATION.<br \/>\u2022220 KV, 220 KM-PMC FOR OHL AND SUBSTATIONS IN KAZAKHSTAN (CPC EXPANSION, KAZAKHSTAN PIPELINE VENTURES LLC, ASTANA).<\/p><p>Solar Energy System<\/p><div id=\"model-response-message-contentr_592c616c916d6216\" class=\"markdown markdown-main-panel stronger enable-updated-hr-color\" dir=\"ltr\" aria-live=\"polite\" aria-busy=\"false\"><p data-path-to-node=\"0\">\u00a0Golden Jewel Company Projects in Solar Energy<\/p><p data-path-to-node=\"3\"><b data-path-to-node=\"3\" data-index-in-node=\"0\">1. Solar Power System Project at Mushrif Mall \u2013 Abu Dhabi, UAE<\/b><\/p><p data-path-to-node=\"3\">Golden Jewel Company implemented an integrated solar photovoltaic (PV) system project at Mushrif Mall. The scope included the supply, installation, and commissioning of the system according to the latest technical standards. The project also featured the construction of modern parking lots equipped with solar panels to generate electrical power, contributing to enhanced energy efficiency within the commercial center. The system&#8217;s generation capacity reached approximately <b data-path-to-node=\"3\" data-index-in-node=\"539\">550 kW<\/b>.<\/p><p data-path-to-node=\"4\"><b data-path-to-node=\"4\" data-index-in-node=\"0\">2. Integrated Solar Power System Project at Cleveland Clinic \u2013 Abu Dhabi<\/b><\/p><p data-path-to-node=\"4\">The company executed a comprehensive PV solar energy system project at Cleveland Clinic. The scope of work covered all project phases, from supply and installation to full commissioning. The works also included the implementation of mechanical and electrical engineering aspects, alongside conducting grid-connection tests to ensure performance efficiency and stability. The total project capacity reached <b data-path-to-node=\"4\" data-index-in-node=\"479\">1 MW<\/b>.<\/p><p data-path-to-node=\"5\"><b data-path-to-node=\"5\" data-index-in-node=\"0\">3. Multi-Site Solar Carport Systems Projects \u2013 Emirates of Abu Dhabi and Sharjah<\/b><\/p><p data-path-to-node=\"5\">Golden Jewel Company implemented a series of multi-site projects across the Emirates of Abu Dhabi and Sharjah. These included the design, supply, and construction of shaded parking lots equipped with integrated PV solar systems. These projects aimed to effectively utilize spaces and convert solar energy into clean electrical power across various locations, with a total generation capacity of approximately <b data-path-to-node=\"5\" data-index-in-node=\"490\">2 MW<\/b>.<\/p><p data-path-to-node=\"6\"><b data-path-to-node=\"6\" data-index-in-node=\"0\">4. Solar Power Systems Project for Villas and Rest Houses \u2013 Al Khatim (Dahan) Area, Emirate of Abu Dhabi<\/b><\/p><p data-path-to-node=\"6\">The company completed an integrated project to provide villas and rest houses in the Al Khatim (Dahan) area with PV solar systems. The project encompassed the supply, installation, and commissioning of the systems according to the highest technical specifications. The first phase involved implementing systems for 50 residential villas and 30 rest houses, reflecting the project&#8217;s commitment to supporting sustainability in the residential sector. The total project capacity reached approximately <b data-path-to-node=\"6\" data-index-in-node=\"603\">1.8 MW<\/b>.<\/p><\/div><p>\u00a0<\/p><p>\u202211 KV POWER DISTRIBUTION NETWORK AND 11KV SUBSTATION AND CABLING WORKS IN TIP (TAWAZUN INDUSTRIAL PARK &#8211; TIP).<\/p><p>\u202211 KV POWER DISTRIBUTION NETWORK AND 11KV SUBSTATION AND CABLING WORKS IN ALAIN (ALSLAMAAT INDUSTRIAL PARK &#8211; TIP).<\/p><p><strong>(INDUSTRIAL &amp; INFRASTRUCTURE PROJECT)<\/strong><br \/>\u2022CORNICHE BEACH REVITALIZATION FOR RECREATIONAL PURPOSE BY CONSTRUCTING ENTERTAINMENT FACILITIES, AIR-CONDITIONED PAVILION WITH RESTAURANT AND CAF\u00c9, VARIOUS OUTDOOR F &amp; B OUTLETS, SHADED STRUCTURE, WATER FOUNTAIN, TOILET BLOCKS, REFURBISHMENT OF UNDERPASS, SOFT LAND- SCAPING, HARD SCAPING AND ALL ASSOCIATED INFRASTRUCTURE AND EARTH WORKS, 2022.<\/p><p>\u2022GENERAL INDUSTRIAL CITY, ABU DHABI, UAE. THE MAIN INFRASTRUCTURE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION FOR ROADS, TRANSPORTATION, POTABLE WATER, IRRIGATION, SEWERAGE, STORM WATER, ELECTRICAL POWER, STREET LIGHTING, PARKING AREAS, MAIN GATE FENCE GUARD TOWERS, WORKSHOPS, STORES AND TELECOMMUNICATIONS SERVICES,2022.<\/p><p>\u2022ALWAJDIAH INDUSTRIAL CITY, AL FUJERAH, UAE THE MAIN INFRASTRUCTURE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION FOR ROADS AND TRANSPORTATION, POTABLE WATER, IRRIGATION, SEWERAGE, STORM WATER,ELECTRICAL POWER, STREET LIGHTING,PARKING AREAS, MAIN GATE FENCE GUARD TOWER,STORES, WORKSHOPS AND TELECOMMUNICATIONS SERVICES .2021.<\/p><p>\u2022AL FUJERAH FEED MILL, FUJERAH, UAE AL FUJERAH FEED MILL IS A LARGE-SCALE PLANT DESIGNED TO PRODUCE INTERNATIONAL STANDARD HORSE, BIRD, AND CAMEL FEED OF THE HIGHEST GRADE TO SERVICE BOTH PERFORMANCE AND STOCK ANIMALS, THE FIRST PHASE OF THE PROJECT OCCUPY OF THE 750M x 750M LAND, CAPABILITY OF THE MILL APPROXIMATELY 4000 TONS OF FEED PER DAY. SCOPE OF WORK DESIGN, SUPPLY OF EQUIPMENT, INSTALLATION OF MEP,CIVIL WORK 2017.<\/p><p>\u2022ZABEEL FEED MILL, DUBAI, UAE ZABEEL FEED MILL IS A LARGE-SCALE PLANT DESIGNED TO PRODUCE INTERNATIONAL STANDARD HORSE, BIRD, AND CAMEL FEED OF THE HIGHEST GRADE TO SERVICE BOTH PERFORMANCE AND STOCK ANIMALS, THE FIRST PHASE OF THE PROJECT OCCUPY OF THE 500M x 500M LAND, CAPABILITY OF THE MILL APPROXIMATELY 1500 TONS OF FEED PER DAY, SCOPE OF WORK DESIGN, SUPPLY OF EQUIPMENT, INSTALLATION OF MEP, CIVIL WORK, 2017.<\/p><p>\u2022CONSTRUCTION OF 54KM, 2 LANE TOW CARRIAGEWAY ROADS IN DABBIYA AREA, INCLUDING 3 KM OF MARINE CAUSEWAYS WITH CONCRETE MULTI CELL CULVERTS JOINING UP TO 4 NO. ADJACENT ISLANDS. THE WORK INVOLVED EARTHWORKS, ROAD CONSTRUCTION, STORM WATER DRAINAGE PIPELINE CULVERTS AND, ASSOCIATED UTILITIES. DEEPENING OF ACCESS CHANNEL BY DREDGING, ENLARGING OF OFFSHORE MAN-MADE OIL RIG ISLAND BY RECLAIMING USING DREDGED MATERIALS,2015.<\/p><p>\u2022CONSTRUCTION INTERNAL ROADS AND INFRASTRUCTURE FOR 500 LOW COST HOUSES IN AJMAN TOWNSHIP, DEVELOPMENT INCLUDES OF ROADS, FOOTPATHS, STORM WATER DRAINAGE NETWORK, SEWER NETWORK INCLUDING SEWERAGE TREATMENT PLANT COMPLEX, LV ELECTRICAL POWER NETWORK STREET LIGHTING AND TELECOMMUNICATION DUCT WORKS, 2014.<\/p><p>\u2022CONSTRUCTION INTERNAL ROADS AND INFRASTRUCTURE FOR 300 LOW COST HOUSES IN WADI FLAIE TOWNSHIP, DEVELOPMENTS INCLUDE OF ROADS, FOOTPATHS, STORM WATER DRAINAGE NETWORK, SEWER NETWORK INCLUDING SEWERAGE TREATMENT PLANT COMPLEX, LV ELECTRICAL POWER NETWORK STREET LIGHTING AND TELECOMMUNICATION DUCT WORKS,2013.<\/p><p>\u2022CONSTRUCTION INTERNAL ROADS AND INFRASTRUCTURE FOR THE NEW RESIDENTIAL LANDS IN AL MAQTAA TOWNSHIP, DEVELOPMENTS INCLUDE OF ROADS, FOOTPATHS, STORM WATER DRAINAGE NETWORK, SEWER NETWORK INCLUDING SEWERAGE TREATMENT PLANT COMPLEX, LV ELECTRICAL POWER NETWORK STREET LIGHTING AND TELECOMMUNICATION DUCT WORKS.2013.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>THE PROJECTS LISTED ON THE ITEMS BELOW COMPRISE A SELECTION OF SUCCESSFULLY EXECUTED. (WATER &amp; WASTEWATER PROJECT)\u2022JUBAL ALI WATER REVERSE OSMOSIS PLANTHAS A CAPACITY OF 120,000 M3\/ DAY.\u2022AJMAN WATER REVERSE OSMOSIS PLANTHAS A CAPACITY OF 160,000 M3\/DAY.\u2022AL GULF VILLAGE WATER REVERSE OSMOSIS PLANT HAS A CAPACITY OF 60,000M3\/DAY.\u2022KAIZAD WATER REVERSE OSMOSIS PLANTHAS A CAPACITY OF [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1679","page","type-page","status-publish","hentry"],"lang":"en","translations":{"en":1679,"ar":2130},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/pages\/1679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/golden-jewel.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1679"}],"version-history":[{"count":3,"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/pages\/1679\/revisions"}],"predecessor-version":[{"id":2344,"href":"https:\/\/golden-jewel.com\/index.php?rest_route=\/wp\/v2\/pages\/1679\/revisions\/2344"}],"wp:attachment":[{"href":"https:\/\/golden-jewel.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}